FIELD: construction engineering. SUBSTANCE: according to method, shuttering panels are arranged with pretension, parallel to each other at distance which corresponds to thickness of concrete wall being built with use of clamping links with tubular struts. After filling spacing between shuttering panels with concrete mix and hardening of concrete, clamping links are removed from ready wall together with shuttering panels. Tubular struts remaining in concrete wall are filled with sealing material. Sealing material is delivered under pressure so as to fill all recesses and notches. EFFECT: high efficiency. 70 cl, 7 dwg