FIELD: construction engineering. SUBSTANCE: according to method, shuttering panels are located parallel to each other and in stressed condition at distance from each other which corresponds to thickness of concrete wall to be erected. Used for this purpose are clamping links which are provided with tubular spacers. After filling intermediate space between shuttering panels with concrete, clamping links are removed from ready made concrete wall, and shuttering panels are also removed. After that, tubular spacers remaining in concrete wall are connected by means of pipe with at least one other tubular spacer and/or sealing device known in art. At filling of tubular spacer, sealing material is delivered under pressure through pipe into other tubular spacer and/or into sealing device. Application of aforesaid method ensures water-proofing of walls due to use of shuttering with pressed-in tubular spacers which are filled with sealing material. EFFECT: higher efficiency. 7 cl, 5 dwg
Authors
Dates
1999-02-20—Published
1993-05-13—Filed