FIELD: metallurgy; rolling plants; manufacture of gas pipes, oil pipes, vessels for aggressive liquids. SUBSTANCE: method comes to assembling a pack of layers of main and cladding metal, heating and hot rolling of pack. Rolling at first pass is carried out with absolute upsetting equal to initial thickness of cladding layer and during the second, third and fourth passes with relative deformation by 20-40% and further on with relative deformation by 30-50% until metal of required thickness is obtained. Metals can be assembled into pack with processing tolerance in width and length of main metal layer determined as stated in description of invention. EFFECT: enlarged operating capabilities. 2 cl, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAKING LARGE-SIZE CLAD SHEETS | 2002 |
|
RU2225781C2 |
METHOD FOR PLATED METAL SHEET MANUFACTURE | 2015 |
|
RU2629422C2 |
METHOD OF PRODUCING CLAD METAL SHEET | 2009 |
|
RU2421312C2 |
METHOD OF MAKING LAMINAR RUSTPROOF STEEL | 2010 |
|
RU2464140C2 |
CLAD SHEET MANUFACTURING METHOD | 2019 |
|
RU2709302C1 |
METHOD OF PRODUCTION OF BIMETALLIC VESSELS | 1995 |
|
RU2087285C1 |
METHOD FOR DEFORMATION-HEAT TREATMENT OF BIMETALLIC MATERIAL | 2022 |
|
RU2779416C1 |
PRODUCTION OF BIMETAL PRECIOUS METAL ROLLED STOCK | 2014 |
|
RU2562191C1 |
METHOD FOR MAKING SEMIFINISHED PRODUCTS OF LIGHT-WEIGHT ENERGY- AND SOUND- ABSORBING HEAT INSULATION MATERIAL | 2001 |
|
RU2205726C1 |
BIMETAL STRIP, FOR INSTANCE FOR WELDED PIPES, AND BIMETAL STRIP MANUFACTURE METHOD | 1991 |
|
RU2068324C1 |
Authors
Dates
1998-01-27—Published
1996-09-11—Filed