FIELD: mining industry. SUBSTANCE: this can be used for relieving from rock pressure, protection and degassing of outburst-risky and gas-bearing seams. Degassing method implies driving of drainage working in roof and foot of gas-bearing seam prior to start of driving development workings in seam being protected, and installation of temporary support in working. Drainage working is driven at distance from seam being protected not exceeding 8.5-fold width of drainage working. Placed on its foot is perforated gas pipeline, then working is caved. Driving of development workings in protected seam is initiated after reduction of gas-bearing capacity of section being degassed to safety level. EFFECT: high efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEGASSING THE GAS-BEARING BEDS AND METHANE CAPTURING | 1992 |
|
RU2054556C1 |
METHOD FOR DEGASSING OF COAL SEAMS | 1998 |
|
RU2136890C1 |
METHOD FOR EXTRACTING METHANE FROM COAL SEAMS | 1998 |
|
RU2136850C1 |
METHOD FOR MINING GASSY AND OUTBURST-PRONE STRATA | 0 |
|
SU1756585A1 |
METHOD FOR TREATMENT OF IMPACT-RISKY SEAMS IN DIFFICULT MINING AND GEOLOGICAL CONDITIONS | 1995 |
|
RU2083831C1 |
METHOD OF PREPARATION OF COAL SEAMS PRONE TO GAS DYNAMIC PHENOMENA | 0 |
|
SU1709114A1 |
COAL-BEARING STRATA DEGASATION METHOD | 2008 |
|
RU2382882C1 |
METHOD TO DEGAS COAL-BEARING SERIES | 2012 |
|
RU2487246C1 |
METHOD FOR DEGASSING OF OVERWORKED ADJACENT SEAMS | 2020 |
|
RU2749707C1 |
METHOD OF MINING OF THICK INCLINED OUTBURST-PHONE SEAM | 1998 |
|
RU2143074C1 |
Authors
Dates
1998-01-27—Published
1996-07-19—Filed