FIELD: oil production industry. SUBSTANCE: according to method, bore-holes are drilled in productive oil bed. In course of drilling, sheathing is created on wall of bore-hole which is impermeable for drilling mud. This sheathing transmits drilling mud pressure to bore-hole wall. Maximal value of drilling mud pressure is determined as hydraulic fracturing pressure of oil bed. Minimal value of drilling mud pressure is determined as pressure characterizing sharp lowering of permeability of bed ground. In addition, method implies lowering of casing string into bore-hole, cementation and perforation of casing string. Pressure in bore-hole is maintained in performing all operations relating to opening of oil bed until hardening of cement mortar in annular space of casing string. EFFECT: higher efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2285794C1 |
METHOD OF DIRECTIONAL LOADING OF THE PLAST | 2016 |
|
RU2645684C1 |
PROCESS CAUSING OR RAISING INFLOW OF FLUID IN WELLS | 1999 |
|
RU2163666C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
METHOD OF WELL REPAIRS | 2001 |
|
RU2188317C1 |
METHOD FOR DETERMINING SHAFT STABILITY OF INCLINED WELLS | 2011 |
|
RU2472928C2 |
METHOD FOR DETERMINING HORIZONTAL WELL SHAFT STABILITY | 2011 |
|
RU2473802C2 |
METHOD FOR INCREASING COEFFICIENT OF OIL WELL PRODUCTIVE CAPACITY | 1992 |
|
RU2085718C1 |
METHOD OF INJECTION WELL TREATMENT | 2001 |
|
RU2213852C2 |
WELL CEMENTING METHOD | 2022 |
|
RU2797167C1 |
Authors
Dates
1998-05-10—Published
1996-04-25—Filed