FIELD: mining industry. SUBSTANCE: this can be used in underground mining of mineral deposits when artificial ceiling must be provided so as to ensure safety execution of mining operations. According to method, primary and secondary drifts of trapezoidal cross-section are driven and they are supported with alternation of large and small bases of trapezium in roof and floor of ceiling. Primary drifts are supported by metal frames, and secondary drifts are supported by reinforcing nets in compliance with reinforcing arrangement scheme. Axis of primary drifts coincides with axis of remaining interchamber pillars. Supports of drifts are left as working reinforcement of artificial ceiling. Aforesaid embodiment widens field of application to systems with left interchamber pillars. It increases speed of erecting artificial ceilings and stoping of chambers due to their larger span. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING MAN-MADE CEILING | 0 |
|
SU877081A1 |
METHOD FOR MINING THICK STEEPLY INCLINED AND STEEP COAL BEDS | 2009 |
|
RU2398966C1 |
METHOD TO INCREASE STABILITY OF CEILING IN DOWNWARD SLICING DEVELOPMENT OF DEPOSIT WITH BACKFILLING | 2010 |
|
RU2449124C1 |
METHOD FOR THE DEVELOPMENT OF POWERFUL GENTLE AND INCLINED ROCK BURST HAZARDOUS ORE DEPOSITS | 2021 |
|
RU2761226C1 |
METHOD OF MINERAL DEPOSIT UNDERGROUND MINING IN STRIPS | 2002 |
|
RU2215145C1 |
METHOD OF ROOF ADVANCED ATTACHMENT AT PILLAR EXTRACTION BETWEEN WORKINGS FILLED WITH CONCRETE | 2010 |
|
RU2451180C1 |
ARTIFICIAL CEILING STRUCTURE OF STOPING WORKING | 0 |
|
SU950923A1 |
METHOD FOR STOWING CAVITIES IN ROOF OF MINING ENTRY WAYS AT DEVELOPMENT OF UPPER LAYER WITH LAYING | 2010 |
|
RU2435964C1 |
METHOD OF SLANT COAL SEAMS DEVELOPMENT | 1994 |
|
RU2068498C1 |
METHOD FOR ROOF CONTROL IN MINING COAL SEAMS | 1992 |
|
RU2067174C1 |