FIELD: mining.
SUBSTANCE: in the course of roof early attachment at pillar extraction between workings filled with concrete first the cuts of the first turn are done through the pillars the width of which is equal to one working span. Then they are filled with concrete. The second turn cuts are done with the following concrete filling. After the cutting of the first turn there mounted is an advance support installed in the pillar from the cuts of the first turn at the level of second turn cut dome at an angle 60-70° against cut axis with pitch 0.5-1.0 m.
EFFECT: increase of works safety.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STOWING CAVITIES IN ROOF OF MINING ENTRY WAYS AT DEVELOPMENT OF UPPER LAYER WITH LAYING | 2010 |
|
RU2435964C1 |
METHOD TO INCREASE STABILITY OF CEILING IN DOWNWARD SLICING DEVELOPMENT OF DEPOSIT WITH BACKFILLING | 2010 |
|
RU2449124C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD FOR PERFORATING A FOREHEAD OF A TUNNEL BOTTOM | 2019 |
|
RU2723422C1 |
METHOD FOR FORMING A DISMANTLING CHAMBER WHEN DEVELOPING SLIM COAL BEDS | 2020 |
|
RU2743162C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES BY MECHANIZED COMPLEX | 1997 |
|
RU2135772C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD OF MINING THICK STEEP DEPOSITS OF UNSTABLE ORES | 2009 |
|
RU2405108C1 |
METHOD OF MINERAL DEPOSIT UNDERGROUND MINING IN STRIPS | 2002 |
|
RU2215145C1 |
Authors
Dates
2012-05-20—Published
2010-11-22—Filed