FIELD: miming, development of slant coal seams with angles of seam dip of 0 - 15 deg during roof control by cast solidifying packing of goaf. SUBSTANCE: method provides for stripping and preparation of extraction field by runs, making ventilation and excavation drifts from runs and their connection by joinings, excavation of coal at each section by passes from excavation drift beginning from wing boundary, filling them with cast mixture and achievement of norm flowing through degree of cast mixture. Passes are exercised along seam dip by establishing coal pillars between them. equal to width of passes. After cast mixture obtains strength in neighboring passes coal pillars are worked. Then after working of excavation section is finished ventilation and excavation drifts are filled with cast mixture till joints and located between them coal pillar is excavated with following its worked space filling with cast mixture. EFFECT: method allows to exercise development of slant seams. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF COAL SEAMS | 1994 |
|
RU2069266C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD FOR ROOF CONTROL IN MINING COAL SEAMS | 1992 |
|
RU2067174C1 |
METHOD OF WORKING THICK SLOAPING COAL SEAMS BY ASCENDING HORIZONTAL LAYERS | 0 |
|
SU866194A1 |
METHOD FOR MINING OF THICK COAL SEAMS | 1993 |
|
RU2069751C1 |
METHOD OF HYDROMECHANICAL MINING OF STEEP COAL SEAMS | 0 |
|
SU1298381A1 |
METHOD OF DRIVING PAIRED WORKINGS ON THIN FLAT COAL BEDS WITH LEAVING ROCK IN MINE | 2024 |
|
RU2827324C1 |
METHOD FOR EXPLOITATION OF STEEP COAL SEAMS WITH BACKFILL OF WORKED SPACE | 1994 |
|
RU2064580C1 |
METHOD FOR THICK STEEP MINERAL SEAM MINING ALONG WITH GOAF FILLING | 2005 |
|
RU2283431C1 |
Authors
Dates
1996-10-27—Published
1994-01-10—Filed