FIELD: replacement of defective pipes lines without digging-out trenches. SUBSTANCE: first, well is made by means of self-moving end-piece compacting the soil; then rope is passed through this well; ends of rope are secured on winch and on working member. Rope is pulled through defective pipe line breaking it and forming well into which new pipe line is passed. EFFECT: enhanced reliability and accuracy of laying the pipe line. 4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPLACEMENT OF PIPE LINE WITHOUT DIGGING-OUT TRENCHES AND DEVICE FOR REALIZATION OF THIS METHOD | 1996 |
|
RU2116547C1 |
METHOD OF REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115856C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINE | 1995 |
|
RU2099624C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES | 1996 |
|
RU2105919C1 |
METHOD FOR ACTUATION OF PNEUMATIC PERCUSSION MECHANISM AND DEVICE FOR ITS REALIZATION | 2002 |
|
RU2244072C2 |
METHOD OF TRENCHLESS PIPELINE LAYING | 2002 |
|
RU2231600C1 |
METHOD AND DEVICE FOR REPLACEMENT OF EXISTING EMERGENCY PIPELINES | 2014 |
|
RU2562331C1 |
DEVICE FOR REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115053C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES AND DEVICE FOR REALIZATION OF THIS METHOD | 1999 |
|
RU2156909C1 |
METHOD OF TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINES | 1999 |
|
RU2166685C1 |
Authors
Dates
1998-07-27—Published
1996-02-23—Filed