FIELD: replacement and repair of underground pipe lines. SUBSTANCE: working member is erected in inlet pit, after which it is centered relative to pipe line to be removed and pulled into intake pit. Simultaneously, working member pulls new pipe line. EFFECT: enhanced reliability and accuracy of laying pipe line. 26 cl, 16 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR REPLACEMENT OF EXISTING EMERGENCY PIPELINES | 2014 |
|
RU2562331C1 |
REPLACEMENT OF DEFECTIVE PIPE LINE PARTIALLY OR FULLY FILLED WITH SOIL WITHOUT DIGGING-OUT TRENCH | 1996 |
|
RU2116546C1 |
METHOD OF TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINES | 1999 |
|
RU2166685C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES | 1996 |
|
RU2105919C1 |
METHOD OF REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115856C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES AND DEVICE FOR REALIZATION OF THIS METHOD | 1999 |
|
RU2156909C1 |
PERCUSSIVE PNEUMATIC UNIT | 1999 |
|
RU2173254C2 |
DEVICE FOR REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115053C1 |
DEVICE FOR TRENCHLESS REPLACEMENT OF PIPELINES | 2001 |
|
RU2221181C2 |
DEVICE FOR TRENCHLESS REPLACEMENT OF PIPELINES | 1999 |
|
RU2386884C2 |
Authors
Dates
1998-07-27—Published
1996-02-23—Filed