FIELD: motor road building technology. SUBSTANCE: according to method, slabs which have to be removed as last ones are anchored relative to ground base. Then, tipping ramp is brought under non-anchored slabs so that their protruding guide members are seated on guide members of ramps. After that, slabs are lifted and loaded into containers vertically standing on platform of carrying vehicle. As containers are being filled with removed slabs, filled containers are taken out and replaced with empty containers. Application of aforesaid method allows to simplify operations of removing and placing of road pavement slabs and to increase productivity. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PLACER OF SLABS FOR SECTIONAL ROAD PAVEMENTS WITH DIVIDED LANES | 1993 |
|
RU2084581C1 |
STACKER OF DISMOUNTABLE TREAD ROADWAY COVERINGS | 2015 |
|
RU2622569C1 |
SELF-PROPELLED VIBRATING ROLLER WITH EXCITER OF COMBINATION EFFECT | 1994 |
|
RU2079610C1 |
METHOD AND TOOL FOR THERMAL CUTTING OF HARD MATERIALS | 1998 |
|
RU2130547C1 |
METHOD FOR INSTALLATION AND REMOVAL OF LIGHT ROAD MATS | 2021 |
|
RU2783154C2 |
BUCKET OF EARTH-MOVING MACHINE | 1995 |
|
RU2098563C1 |
PREFABRICATED DETACHABLE BUILDING | 0 |
|
SU920132A1 |
TRACKED PREFABRICATED BRIDGE FOR PASSING LOADS OF LIGHT WEIGHT CATEGORY | 2016 |
|
RU2660767C1 |
METHOD OF APPLYING PROTECTIVE COATING | 1996 |
|
RU2110602C1 |
ROAD COATING WITH WHEEL TRACK | 0 |
|
SU749966A1 |
Authors
Dates
1998-09-20—Published
1996-11-10—Filed