FIELD: construction engineering. SUBSTANCE: this relates to erection of wall in water-saturated and unstable ground. Realization of method implies operations for digging trench and filling it with thixotropic solution for further erection of reinforced concrete wall in trench. Installed above dug out trench is load-hoisting and guiding equipment for erection of wall from separate units. Due to available guiding structure, joining of wall units is effected when they are continuously held and through their entire height. After lowering each unit in design position, brought into trench is inflatable flexible vessel, and performed by means of this vessel is compression of joints between wall units. Application of aforesaid method allows for erection of high-quality wall at improved productivity and lower labour expenses. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PREFABRICATED REINFORCED-CONCRETE WALL IN GROUND AND METHOD OF ITS ERECTION | 1997 |
|
RU2119992C1 |
TUNNELING SHIELD COMPLEX FOR CONSTRUCTION OF BOX-SECTION TUNNELS | 1998 |
|
RU2130120C1 |
METHOD OF ERECTING IN GROUND OF SECTIONAL-PANELLED WALL OF CURVILINEAR STRUCTURE AND WALL PANEL ERECTED BY SUCH METHOD | 0 |
|
SU687189A1 |
METHOD OF ERECTING PREFABRICATED FERROCONCRETE MULTILEVEL WALL IN EARTH | 0 |
|
SU749977A1 |
METHOD FOR TRENCHLESS PIPE LAYING | 2000 |
|
RU2160341C1 |
METHOD AND ANCHOR SYSTEM FOR SECURING PIT BORDERING | 2003 |
|
RU2254417C1 |
METHOD OF ERECTING PREFABRICATED FERROCONCRETE WALL IN SOIL | 0 |
|
SU718545A1 |
METHOD OF ERECTING A PREFABRICATED-MONOLITHIC WALL IN SOIL | 0 |
|
SU753987A1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
Authors
Dates
1998-12-20—Published
1998-04-02—Filed