FIELD: building, particularly for bordering or stiffening the sides of foundation pits.
SUBSTANCE: method involves driving vertical piles in ground along pit perimeter for depth exceeding pit bottom level; excavating ground up to reaching pit bottom level to open bordering member surfaces facing inwards; securing horizontal distribution beams to above surfaces to create framing belt; installing spaced cross-pieces along pit perimeter; leaning the first cross-piece ends against distribution beams and securing the second ends thereof into pit bottom ground; removing cross-pieces after reinforced concrete pit bottom forming. Ground is excavated to form inner initial pit and then stepped trench is dug out under the protection of thixotropic mix along the initial pit perimeter in direction transversal to bordering formed by piles. Lower trench step is located below pit bottom level and the second cross-piece ends are secured to above step which is then concreted under the protection of thixotropic mix. After hardening support shoe of cross-pieces trench is filled with previously excavated ground and ground is excavated of the pit up to reacting pit bottom level.
EFFECT: possibility to consolidate pit just after the initial pit and framing belt forming.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO REINFORCE FOUNDATION PIT BOARDS | 2010 |
|
RU2417284C1 |
TECHNIQUE TO ERECT ANTIFILTRATION ENGINEERING-PROTECTIVE STRUCTURE | 2001 |
|
RU2211283C1 |
PROCESS OF ERECTION OF GUARDING ANTIFILTRATION ENGINEERINGPRTECTIVE STRUCTURE | 2001 |
|
RU2206663C1 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
METHOD FOR CONSTRUCTING PITS | 0 |
|
SU1794192A3 |
METHOD FOR SHEET-PILE ENCLOSURE OR RETAINING WALL FORMING WITH GROUND WATER FLOW CONTROL | 2004 |
|
RU2283921C2 |
PILE | 2001 |
|
RU2204653C2 |
WALL OF UNDERGROUND STRUCTURE | 0 |
|
SU1756465A1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE | 2009 |
|
RU2392388C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
Authors
Dates
2005-06-20—Published
2003-12-15—Filed