FIELD: pipeline construction engineering. SUBSTANCE: this can be used in construction of pipelines in permafrost conditions. Support has foundation pile upon which movably fastened through resilient members such as springs is cradle for pipeline. Support is provided with measuring bar with sighting device intended for registering displacements of pile caused by forces generated due to swelling of frozen ground. According to displacements of pile, being adjusted is setting of springs in support so as to reduce stresses in pipeline. Given in description of invention is mathematical relation of spring rigidity versus value of pile displacements caused by swelling of frozen ground. Application of aforesaid embodiment of support enhances reliability of pipeline structure due to adjustment of stresses in pipeline. EFFECT: higher efficiency. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ABOVE GROUND PIPELINE SUPPORT | 2022 |
|
RU2781733C1 |
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL | 2022 |
|
RU2785329C1 |
SYSTEM FOR SUPPORTING PIPELINE | 2004 |
|
RU2249747C1 |
SEISMIC PROTECTIVE SUPPORT FOR PIPELINE | 2009 |
|
RU2391594C1 |
METHOD FOR DETERMINING MINIMAL OUTPUT ENSURING DELIVERY OF BED FLUID FROM BOTTOM HOLE OF GAS WELLS AND GAS-CONDENSATE WELLS | 1998 |
|
RU2124635C1 |
METHOD FOR DETERMINING LOWER BOUNDARY OF OCCURRENCE OF PERMAFROST GROUND | 1998 |
|
RU2125149C1 |
PIPELINE ADJUSTABLE SUPPORT WITH FEEDBACK | 2006 |
|
RU2335685C1 |
METHOD FOR DETERMINING PARAMETERS OF GAS-BEARING BED AND OUTPUT OF WELLS DRILLED IN BED | 1998 |
|
RU2125151C1 |
PIPELINE MOVABLE SUPPORT AND ITS SUPPORT UNIT | 2014 |
|
RU2572743C2 |
DEVICE FOR IMPROVING RELIABILITY IN OPERATION AND REPAIR OF WELLS | 1999 |
|
RU2146755C1 |
Authors
Dates
1999-01-10—Published
1998-02-16—Filed