FIELD: mining industry, blasting operations to drive raises. SUBSTANCE: objective of invention consists in increased efficiency of sectional breaking by explosive charges thanks to raised accuracy of selection, order and delayed blasting of holes in outline of raise which enables cost of one running meter of raise to be reduced and specific consumption of explosives to be diminished. Process driving raise includes drilling of singular holes through height of raise, mine survey of drilled holes, charging of holes with explosives, initiation and sectional blasting of explosive charges in holes. Mine survey of mouth and bottom of each hole is conducted in single coordinate system x-y, value of displacement of holes at any required height of raise relative to points of sinking of mouth and bottom of holes is determined by given formulas. Then order and degree of delay of hole blasting are established by obtained parameters of increments of coordinates. First holes with least parameters of increments of coordinates are blasted. EFFECT: increased efficiency of raise driving. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING MINED BLOCKS DURING SUBTERRANEOUS EXTRACTION OF BLIND ORE BODIES | 2001 |
|
RU2224891C2 |
METHOD OF WORKING DRIVING | 1996 |
|
RU2126133C1 |
PROCEDURE OF BLAST BREAKING OF ORE BLOCKS CLEAVED BY DIKE | 2001 |
|
RU2200298C2 |
PROCESS OF UNDERGROUND DEVELOPMENT OF THICK ORE DEPOSITS | 2001 |
|
RU2203419C2 |
METHOD FOR FORMATION OF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2000 |
|
RU2166728C1 |
METHOD OF MINE WORKING DRIVING | 1999 |
|
RU2168636C2 |
METHOD OF BREAKING ORE BLOCKS COMPLICATED BY POST-R DIKE MAGMATISM | 2000 |
|
RU2191900C2 |
PILLARS DEMOLITION METHOD | 1991 |
|
RU2046941C1 |
METHOD OF ROCK MASS PROTECTION FROM ROCK PRESSURE | 2000 |
|
RU2191901C2 |
METHOD FOR FORMATION OF WATER-PROOF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2001 |
|
RU2210055C2 |
Authors
Dates
2003-04-27—Published
2001-07-09—Filed