FIELD: mining industry. SUBSTANCE: method includes drilling of compensation cavity and blast holes, filling of water into compensation cavity of conjugated blast holes in amount equaling 0.2 of its volumetric capacity, and filling of explosive charges into blast holes, and their blasting with short delay, with formation of cut cavity by direct blasting of explosive charges. Cut cavity is formed by explosive charges of conjugated blast holes, and stream of flowing water is passed compensation cavity. EFFECT: higher efficiency of works and reduced cost of mine working driving. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DRIVING OF MINE WORKING | 1994 |
|
RU2097679C1 |
METHOD OF WORKING DRIVING | 1996 |
|
RU2126133C1 |
METHOD OF FORMATION OF PLANE EXPLOSIVE CHARGE | 1996 |
|
RU2114388C1 |
PILLARS DEMOLITION METHOD | 1991 |
|
RU2046941C1 |
METHOD FOR DRIVING UNDERGROUND WORKING | 1993 |
|
RU2102601C1 |
METHOD OF CREATING CUTTING SPACE | 1994 |
|
RU2082070C1 |
PROCESS DRIVING RAISE | 2001 |
|
RU2203422C2 |
METHOD OF MINE WORKING SINKING | 1998 |
|
RU2179242C2 |
METHOD OF ROCK MASS MINING BY BENCHES | 1992 |
|
RU2088759C1 |
ORE BLOCK COMPLETION METHOD | 0 |
|
SU1765402A1 |
Authors
Dates
2001-06-10—Published
1999-05-11—Filed