FIELD: electrified railway transport. SUBSTANCE: proposed method is based on determining summary time interval at no traction load within preset time by recording time intervals during which ratio of track currents between buses of substations is in inverse proportion to ratio of their resistances. Route mean square value of equalizing current is calculated by formed time interval and current values of odd and even tracks. EFFECT: enhanced accuracy of measurement, simplified checking. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING EQUALIZING CURRENT THROUGH SECTION OF AC TRACTION NETWORK WITH DOUBLE-ENDED POWER SUPPLY | 1997 |
|
RU2116206C1 |
SYSTEM TO CONTROL SUPPLY DIVIDER OF ELECTRIFIED RAILWAY AC TRACTION SYSTEM | 2003 |
|
RU2248282C2 |
METHOD FOR DETERMINING THE VALUE OF CONTROL ACTION WITH AN AUTOMATIC DECREASE IN THE CIRCULATING CURRENT IN A 25 kV TRACTION NETWORK | 2022 |
|
RU2788251C1 |
25 KV ALTERNATING CURRENT SUPPLY SYSTEM FOR ELECTRIFIED RAILROADS | 2014 |
|
RU2552572C1 |
METHOD FOR REDUCING POWER LOSSES IN AC TRACTION NETWORK | 2016 |
|
RU2644150C2 |
SYSTEM TO CONTROL POWER SUPPLY DIVIDER OF AC TRACTION SYSTEM OF ELECTRIFIED RAILWAYS | 2004 |
|
RU2291069C2 |
INFORMATION SYSTEM FOR DETERMINING CAUSES FOR EQUALIZING CURRENT IN TRACTION POWER SUPPLY SYSTEMS OF ALTERNATING CURRENT | 2021 |
|
RU2767552C1 |
METHOD FOR DETERMINATION OF PROCESS LOSSES OF ELECTRIC POWER IN RAILROAD ELECTRIC TRACTION NETWORK | 2014 |
|
RU2572797C2 |
ELECTRIC POWER SUPPLY SYSTEM OF ELECTRIFIED AC RAILWAYS | 2011 |
|
RU2478049C1 |
SYSTEM FOR CONTROLLING THE VOLTAGE LEVEL IN A CONTACT SYSTEM | 2021 |
|
RU2775174C1 |
Authors
Dates
1999-03-27—Published
1997-09-05—Filed