FIELD: construction engineering. SUBSTANCE: method can be used for waterproofing of dead storages of waste, dumping sites, pipelines, and also for waterproofing of construction basins. According to method, use is made of consolidating materials which are injected into ground. For this purpose, at least one bore-hole is drilled from ground surface beyond ground volume to be waterproofed. Bore-hole is drilled below aforesaid ground volume. Consolidating material is injected into ground area which surrounds bore-hole. Remotely controlled and directed drilling head is provided with nozzles for injecting consolidating material into ground. This allows for creation of simple method for complete waterproofing of substantial volumes of ground including sources of fouling such as dead storages of radioactive waste, also of pipelines and construction basins being erected. EFFECT: higher efficiency. 26 cl, 18 dwg
Authors
Dates
1999-04-20—Published
1994-04-28—Filed