FIELD: building industry, possibly manufacture or erection of prestressed ferroconcrete constructions with high demands for preventing cracking, especially operating in conditions of aggressive media, with high effort parameters of stressed reinforcement of beams, span structures of bridges, tunnels, reservoirs, reactor vessels, protective covers of nuclear reactors and so on. SUBSTANCE: uniform tension of rope strands is provided along the whole cross section of curvilinear passages. Jamming of slightly curved rope strands by means of sharply bent rope strands is prevented. When rope strands are pulled along passage of construction perforated spacing discs are used. Such discs are secured preliminarily to towing cable. Rope strands are passed through openings of discs. Supporting rollers are mounted on side surface of discs. EFFECT: improved design. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUNDLED BARS | 2010 |
|
RU2453665C1 |
METHOD TO ERECT STRESSED REINFORCED CONCRETE STRUCTURES AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2567569C2 |
SQUEEZING DEVICE | 1994 |
|
RU2079622C1 |
SHELL OF REACTOR DEPARTMENT | 1993 |
|
RU2045642C1 |
PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF BUILDING OR STRUCTURE | 1998 |
|
RU2133802C1 |
METHOD FOR OPERATIONAL CONTROL OF LOAD-BEARING ROPE-BUNDLE REINFORCEMENT TIGHTENING IN PRE-STRESSED BUILDINGS AND STRUCTURES | 2006 |
|
RU2315272C2 |
METHOD FOR ERECTION OF MULTISTORY FRAMEWORK BUILDING | 1998 |
|
RU2137886C1 |
PROTECTIVE SHELL OF NPP REACTOR COMPARTMENT | 2016 |
|
RU2639346C1 |
PRE-STRESSED PROTECTIVE SHELL OF REACTOR COMPARTMENT OF NPP | 2015 |
|
RU2594501C1 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
Authors
Dates
1999-05-27—Published
1997-12-30—Filed