FIELD: power industry.
SUBSTANCE: in the cylindrical part the protective shell comprises circular tubular channel formers, ropes placed therein, collars with rods put on the channel formers, washers embedded into concrete behind the external non-tensioned reinforcement mesh. On the circular tubular channel formers, on the side facing the center of the shell, there is a premade cut under each collar. The outer ends of the rods are provided with thread with nuts screwed onto them and are passed into the holes of the support washers located behind the outer reinforcement mesh with the possibility of displacement. Connection units of the rods with the collars are covered with elastic gaskets made of easily deformable material.
EFFECT: decrease in the material consumption.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
PRE-STRESSED PROTECTIVE SHELL OF REACTOR COMPARTMENT OF NPP | 2015 |
|
RU2594501C1 |
METHOD FOR OPERATIONAL CONTROL OF LOAD-BEARING ROPE-BUNDLE REINFORCEMENT TIGHTENING IN PRE-STRESSED BUILDINGS AND STRUCTURES | 2006 |
|
RU2315272C2 |
METHOD FOR ERECTION OF MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAME OF BUILDING | 2008 |
|
RU2384675C1 |
SHELL OF REACTOR DEPARTMENT | 1993 |
|
RU2045642C1 |
METHOD FOR ERECTION OF MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAME OF BUILDING | 2008 |
|
RU2382852C1 |
NUCLEAR REACTOR PROTECTIVE SHELL | 2022 |
|
RU2784712C1 |
NUCLEAR POWER PLANT | 2021 |
|
RU2767308C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
PRESTRESSED FERROCONCRETE CONSTRUCTIONS | 1997 |
|
RU2131010C1 |
METHOD FOR STRETCHING OF REINFORCEMENT ELEMENT IN REINFORCED CONCRETE PRODUCTS | 2020 |
|
RU2778369C2 |
Authors
Dates
2017-12-21—Published
2016-11-16—Filed