FIELD: mining industry. SUBSTANCE: method can be used for working mineral deposits irrespective of their capacity and lying angle. According to method, deposit is opened by means of underground workings. Main reserves of deposit are extracted by opencast operations with formation of protective berms on quarry benches. In plan elevation, reserves of each level are worked by blasting explosive charges in dipping blast-holes in direction of quarry sides with formation of protective prisms at its design contour. Cutting of mineral reserves is performed at concluding stage of operations at given level with creation of vertical slope or approximate to vertical slope within boundaries of given level. Broken rock mass appeared from destruction of protective prisms is released to underground hauling drifts in underlying level. Then rock mass is extracted to surface. Rock mass near contour is consolidated by injection and/or by installing preliminarily directed anchors. Application of aforesaid method allows for reducing scale of opencast operations. EFFECT: higher efficiency. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENCAST DEVELOPMENT OF DEPOSITS | 1998 |
|
RU2127809C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD FOR COMBINED MINING OF FIELDS | 2011 |
|
RU2471988C1 |
OPENING OF DEPOSIT AT UNDERGROUND MINING | 2014 |
|
RU2591705C1 |
STEEP MINERAL DEPOSIT DEVELOPMENT METHOD | 2005 |
|
RU2279544C1 |
METHOD FOR KIMBERLITE PIPE | 2018 |
|
RU2691032C1 |
METHOD FOR OPENING AND PROCESSING DEEP HORIZONS OF KIMBERLITE PIPES | 2003 |
|
RU2233982C1 |
SELECTING WORKING OF UNWORKED EDGE OF UPLAND MINERAL DEPOSIT QUARRY WORKING ZONE | 2013 |
|
RU2521987C1 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
METHOD OF WORKING INCLINED ORE BODIES | 0 |
|
SU1803561A1 |
Authors
Dates
1999-07-10—Published
1998-02-12—Filed