FIELD: mining industry.
SUBSTANCE: method includes excavation of a quarry up to end contour, construction of quarry border walls at steep angles, freeze-protective covering of shelves slopes, processing of rocks, transporting of it by dump-trucks along the horizon, connected by ore chutes, cross-cuts to slanting spiral-like shaft. Cross-cuts pass from portions of maximum approach of spiral-like shaft to contour of ore body, in mouth portion of ore chute a special construction is formed for centering ore flows, for dump-trucks unloading, slopes of quarry border walls are planed by machines with working organs of rotor-cutting type, covered by freeze-protective gunite layer with variable thermal resistance and is fixed by anchors, processing of central portion of quarry horizons is performed by horizontal shelves, and periphery portions - by shelves slanted to side of quarry border wall, for forming special slanted safety benches.
EFFECT: higher effectiveness and safety of mining during excavation of deep horizons of deposits by open method under conditions of permafrost.
9 dwg, 1 ex, 8 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF KIMBERLITE PIPE MINING | 2000 |
|
RU2196895C2 |
METHOD FOR DEVELOPING DEEP OPEN PITS IN CRYOLITIC ZONE | 2018 |
|
RU2676352C1 |
OPENING OF DEPOSIT AT UNDERGROUND MINING | 2014 |
|
RU2591705C1 |
METHOD OF REFINEMENT OF DEEP KIMBERLITE QUARRIES | 2017 |
|
RU2661769C1 |
METHOD FOR FORMATION OF NONMINING FLANK OF OPEN PIT UNDER PERMAFROST CONDITIONS | 1995 |
|
RU2099528C1 |
METHOD FOR DEVELOPMENT OF DEEP HORIZONS OF DIAMOND-MINING PITS IN CRYOLITHOZONE CONDITIONS | 2019 |
|
RU2698750C1 |
METHOD OF BUILDING UP AN INOPERATIVE SIDE OF DEEP OPEN PIT | 2019 |
|
RU2713844C1 |
METHOD FOR FORMATION OF NONMINING FLANK OF OPENCAST | 1993 |
|
RU2034150C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
METHOD OF STAGELESS DEVELOPMENT OF DEEP KIMBERLITE DEPOSITS | 0 |
|
SU1819330A3 |
Authors
Dates
2004-08-10—Published
2003-03-31—Filed