FIELD: mining industry. SUBSTANCE: method can be used for saving repeatedly operated sections of development workings in mining seams of minerals such as coal, salt, etc. According to method, in advance of work face of longwall in sides of development working undertaken is relieving of seam of mineral for example by creating crack in it. Pliability of mineral seam is increased to value not exceeding pliability of artificial structures erected behind longwall. Depth of relieving mineral seam from side of virgin mass is taken as larger than depth of zone of intensive crushing of seam in marginal part, depth of relieving mineral seam at side of worked-out area is taken as equal to width of artificial structure. Due to aforesaid arrangement, reduced is deformation of roof and risk of its caving connected with appearance close to working of cracks of operating origin. This allows for reducing expenses for maintaining of development workings and repair-restoration operations. EFFECT: higher efficiency. 2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREVENTION OF DEVELOPMENT ENTRIES IN COAL BED AREAS | 2007 |
|
RU2341657C1 |
PROTECTION METHOD OF REUSABLE DEVELOPMENT WORKINGS | 2011 |
|
RU2472935C1 |
METHOD TO SAFEGUARD DEVELOPMENT OPENINGS | 2010 |
|
RU2441164C1 |
METHOD FOR MINING MINERAL DEPOSITS AT LARGE DEPTH | 1991 |
|
RU2013548C1 |
METHOD FOR DEVELOPMENT OF MINE FIELD IN MINING MINERAL BEDS AT LARGE DEPTHS | 1994 |
|
RU2069754C1 |
METHOD OF PILLAR-FREE MINING OF THIN AND MEDIUM-THICK MINERAL BEDS AT GREAT DEPTHS | 0 |
|
SU1346791A1 |
METHOD FOR CONTROL OF ROCK PRESSURE IN EXTRACTION OF MINERAL BEDS AT LARGE DEPTHS | 1994 |
|
RU2069268C1 |
METHOD FOR PREPARATION OF DOUBLE FACES | 1994 |
|
RU2069753C1 |
METHOD OF MINING OF MINERAL BEDS WITH ROOF INSECURE ROCKS | 2002 |
|
RU2209982C1 |
UNDERGROUND MINING METHOD IN AREAS HAVING LIMITED DIMENSIONS | 2005 |
|
RU2282720C1 |
Authors
Dates
1999-08-20—Published
1998-06-01—Filed