FIELD: oil industry. SUBSTANCE: given process can find use in treatment of face zone of wells. Extent of interval of treatment is fixed according to invention relative to face of well. Reagent is pumped under pulsating mode: pumping under pressure of intake of reagent by perforation interval - technological holding under atmospheric pressure. This mode is repeated under reduced pressure of pumping of reagent till pressure of operational pickup of well is achieved. Remaining volume of regent is pumped under steady pressure. Technological holding is conducted and reaction products and pollutants are recovered by swabbing prior to extraction of fluid in volume exceeding that of pumped reagent by factor of three as minimum. EFFECT: enhanced efficiency of treatment.
Title | Year | Author | Number |
---|---|---|---|
WELL DEVELOPMENT METHOD AFTER TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2018 |
|
RU2698354C1 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506421C1 |
METHOD OF FORMATION TREATMENT | 2012 |
|
RU2506420C1 |
METHOD FOR HIGHLY-VISCOUS OIL PRODUCTION FROM HORIZONTAL WELL UNDER RESERVOIR TREATMENT WITH HEAT | 2005 |
|
RU2301328C1 |
NANO-WAVE METHOD OF BOTTOM HOLE ZONE TREATMENT, EQUIPMENT AND PRESSURE MULTIPLIER | 2007 |
|
RU2376454C2 |
METHOD OF INTERVAL-BY-INTERVAL TREATMENT OF PRODUCING FORMATION WITH OPEN HORIZONTAL BOREHOLE | 2014 |
|
RU2570179C1 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD | 2015 |
|
RU2601960C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
DEVELOPMENT METHOD OF BOTTOM-HOLE ZONE | 2012 |
|
RU2506422C1 |
METHOD FOR HORIZONTAL WELL BOTTOM ZONE INTERVAL TREATMENT | 2007 |
|
RU2318999C1 |
Authors
Dates
1999-08-27—Published
1998-12-28—Filed