FIELD: oil and gas production industry. SUBSTANCE: according to method, injected into cavernous space of bottom-hole zone of well is gravel mixture. Mixture is produced from several size fractions of gravel beginning with smallest size fraction to largest fraction which are increasing in size towards bore-hole of well. On completion of gravel filling, injected is permeable plugging compound with particle size of soluble components not larger than size of gravel particles of largest fraction. EFFECT: higher efficiency. 1 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SAND LEAKING ABATEMENT IN BOREHOLES EQUIPPED WITH SUCKER-ROD PUMP, AND DEVICE FOR IMPLEMENTATION THEREOF | 2007 |
|
RU2348801C2 |
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS | 2011 |
|
RU2464410C1 |
METHOD FOR PREVENTING SAND PRODUCTION AND REDUCING WATER INFLUX TO WELL WITH LOW FORMATION TEMPERATURE | 2009 |
|
RU2413067C1 |
METHOD FOR ENERGY-CYCLIC TREATMENT OF WELL IN BED OF NONUNIFORM PERMEABILITY | 1997 |
|
RU2134776C1 |
METHOD OF STABILIZATION OF BOTTOM-HOLE PRODUCING FORMATION ZONES | 1999 |
|
RU2172811C2 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
METHOD FOR FIGHTING AGAINST SAND INGRESSION IN PRODUCTIVE STRATA | 1994 |
|
RU2065929C1 |
METHOD AND DEVICE FOR PROVIDING VERTICAL AND INCLINED WELLS WITH GRAVEL FILTERS | 2001 |
|
RU2261957C2 |
METHOD FOR MAKING WELL STRAINER | 1991 |
|
RU2015309C1 |
METHOD FOR PREVENTION OF FLOODING OF NATURAL AND ARTIFICIAL GAS DEPOSITS | 1996 |
|
RU2124633C1 |
Authors
Dates
1999-09-10—Published
1997-12-16—Filed