FIELD: manufacture of polymermetal high- pressure pipes. SUBSTANCE: pipes of polymers are reinforced by metals both in axial and peripheral directions, then the reinforcement is isolated by a polymeric layer. At recharging of the reinforcement the speed and temperature conditions of the method are changed. For continuity of the method use is made of a compensation device for accumulation and production at recharging of reinforcement. EFFECT: reduced power consumption, enhanced production and reduced fatigue loads. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MOULDING OF SHAPED ARTICLES FROM PLASTIC MATERIALS | 1995 |
|
RU2145544C1 |
METHOD FOR MANUFACTURE OF REINFORCED THREE-LAYER PLASTIC PIPES | 2000 |
|
RU2186685C2 |
WINDING DEVICE FOR CABLE GOODS | 1993 |
|
RU2086494C1 |
METHOD FOR CONTINUOUS PRODUCTION OF REINFORCED POLYMER PIPE AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2709276C1 |
MULTILAYER POLYMER REINFORCED PIPE, METHOD OF CONTINUOUS PRODUCTION THEREOF AND DEVICE FOR IMPLEMENTATION OF METHOD | 2019 |
|
RU2720086C1 |
METHOD FOR CONTINUOUS PRODUCTION OF A MULTILAYER POLYMER REINFORCED PIPE AND A LINE FOR REALIZING THE METHOD | 2019 |
|
RU2718473C1 |
MULTILAYER FLEXIBLE POLYMER PIPE, METHOD FOR ITS CONTINUOUS PRODUCTION AND DEVICE FOR IMPLEMENTATION OF METHOD | 2019 |
|
RU2717736C1 |
STATION FOR FILLING WITH LIQUIFIED HYDROCARBON GASES | 1993 |
|
RU2065547C1 |
PROCESS LINE FOR PRODUCTION OF COMPOSITE REBARS | 2014 |
|
RU2597341C2 |
PROCESS LINE FOR PRODUCTION OF COMPOSITE REBARS | 2015 |
|
RU2597385C2 |
Authors
Dates
1999-09-20—Published
1995-04-03—Filed