FIELD: oil production industry. SUBSTANCE: method can be used in perforation of productive bed in interval after interval. Opening of productive bed is performed by perforation in interval after interval procedure. Perforation interval is preset within range of 1.0 to 1.4 m. Procedure is carried out from top interval to lower interval. Operation of perforation within each interval includes not more than 5 perforation holes made to depth of at least 500 mm. After perforating of each interval, technological pause is made of not shorter than 1 h. Application of aforesaid method enhances efficiency of perforating operation. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONVERTING PRODUCING WELL INTO INJECTION WELL | 1999 |
|
RU2142047C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1999 |
|
RU2142050C1 |
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE | 2000 |
|
RU2157885C1 |
METHOD OF BOTTOM-HOLE ZONE TREATMENT | 2002 |
|
RU2194154C1 |
WELL PERFORATION METHOD | 2009 |
|
RU2382179C1 |
METHOD OF PRODUCING FORMATION PERFORATING | 2001 |
|
RU2205942C2 |
DEVICE FOR EXPOSING AND TREATMENT OF BOTTOM FACE ZONE OF WELL | 1995 |
|
RU2075593C1 |
METHOD OF TREATING WELL BOTTOM ZONE | 1998 |
|
RU2135758C1 |
DEVICE FOR WELL DEPRESSION PERFORATING | 2001 |
|
RU2194848C1 |
METHOD OF WELL COMPLETION | 2001 |
|
RU2173767C1 |
Authors
Dates
1999-11-27—Published
1999-06-03—Filed