FIELD: oil and gas production. SUBSTANCE: invention can be used when treating bottom zone of production well or production well converted into injection well. According to invention, casing string is cleaned, distillate is injected into well, and first process pause is performed. Then, 0.5-5% solution of nonionic surfactant in associated Devonian water is injected into well and forced into formation, after which second process pause follows. Additional depression perforation is carried out and casing string is cleaned once more. EFFECT: increased productivity of well.
Title | Year | Author | Number |
---|---|---|---|
TREATMENT METHOD FOR BOTTOMHOLE ZONE OF INJECTION WELL | 2004 |
|
RU2258134C1 |
METHOD FOR CONVERTING PRODUCING WELL INTO INJECTION WELL | 1999 |
|
RU2142047C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1999 |
|
RU2142050C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL | 1997 |
|
RU2101483C1 |
METHOD FOR OPENING OF PRODUCTIVE BED | 1999 |
|
RU2142044C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2280154C1 |
METHOD FOR BOTTOMHOLE ZONE OF TERRIGENOUS FORMATION TREATMENT | 2005 |
|
RU2278967C1 |
METHOD OF BOTTOM-HOLE ZONE TREATMENT | 2002 |
|
RU2194154C1 |
METHOD FOR COMPLEX WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2261986C1 |
METHOD FOR WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2296215C1 |
Authors
Dates
1999-08-27—Published
1998-12-28—Filed