FIELD: production of polyethylene tubes. SUBSTANCE: process includes positioning of longitudinal metal fitting on mandrel, winding of lateral fitting on it with specified spacing, fixing of fittings in crossing points, formation of polyethylene sheath and division of continuous tube into sections of measured length. Winding at start and finish of measured length is conducted with spacing of t1 between turns which value meets relationship d<t1≤2d, where d is diameter of lateral fitting that is followed by threading on these sections. EFFECT: reduced labor input and saving of consumable materials. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
FLANGE OF METAL-PLASTIC PIPE | 1993 |
|
RU2023932C1 |
METHOD OF MANUFACTURING OF PLASTIC REINFORCED PIPE | 0 |
|
SU1835022A3 |
PIPES (VERSIONS) | 1999 |
|
RU2161748C2 |
POLYETHYLENE PIPE MAKING METHOD | 2000 |
|
RU2190796C2 |
REINFORCED POLYMER PIPE, METHOD AND DEVICE FOR MANUFACTURE OF SUCH PIPE | 2002 |
|
RU2220353C2 |
DEVICE FOR MANUFACTURING ASSEMBLY OF PLASTIC PIPES | 1992 |
|
RU2100198C1 |
REINFORCED POLYMER PIPE, METHOD AND DEVICE FOR MANUFACTURE OF SUCH PIPE | 2002 |
|
RU2220354C2 |
POLYMER REINFORCED TUBE: METHOD AND DEVICE FOR MANUFACTURE OF SUCH TUBE | 2000 |
|
RU2176348C1 |
METHOD OF MANUFACTURE OF POLYMERIC REINFORCED PIPE | 1995 |
|
RU2065118C1 |
POLYMERIC REINFORCED PIPE AND METHOD OF ITS MAKING | 2004 |
|
RU2257504C1 |
Authors
Dates
1999-12-27—Published
1998-06-09—Filed