FIELD: prediction of terms of repairs or replacement of reactor core equipment. SUBSTANCE: thermal scanning devices are inserted in channel, the latter is filled with water whose temperature is lower than that of channel wall, rate of wall cooling down at reference points is measured, then water is drained, and rate of wall heating at reference points is measured; distance between reference points is to be equal to that between large and small graphite rings of stacking; there should be at least four check points in cross-sectional area of channel and they should be arranged in pairs along maximal channel diameter lines. EFFECT: improved reliability, speed, and validity of clearance check results. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR DIAGNOSING PARAMETERS OF NUCLEAR REACTOR PROCESS CHANNELS | 1998 |
|
RU2149467C1 |
METHOD OF CHECK OF CLEARANCE BETWEEN TECHNOLOGICAL CHANNEL AND GRAPHITE LINING OF NUCLEAR REACTOR, TYRE PBMK | 1998 |
|
RU2138862C1 |
METHOD AND DEVICE FOR CHECKING GAS GAP IN PROCESS CHANNEL OF URANIUM-GRAPHITE REACTOR | 2003 |
|
RU2246144C2 |
METHOD FOR RECOVERING SERVICEABILITY OF NUCLEAR REACTOR FUEL ASSEMBLY SUBCHANNEL | 2005 |
|
RU2302671C1 |
METHOD FOR REFUELING WATER-GRAPHITE REACTORS TO INSPECT THEIR PROCESS CHANNELS | 2000 |
|
RU2182734C1 |
METHOD FOR CHECKING CLEARANCE BETWEEN PROCESS CHANNEL AND GRAPHITE STACK OF HIGH-POWER PRESSURIZED-TUBE REACTOR | 1999 |
|
RU2170959C1 |
METHOD FOR REPLACING PROCESS CHANNELS OF WATER- GRAPHITE REACTORS | 1998 |
|
RU2132091C1 |
METHOD OF PROLONGING LIFE OF CHANNEL-TYPE GRAPHITE NUCLEAR REACTOR | 2012 |
|
RU2501105C1 |
METHOD FOR TOP SECTION CASING REPLACEMENT OF URANIUM-GRAPHITE REACTOR | 1995 |
|
RU2078385C1 |
METHOD OF RESTORING LIFE CHARACTERISTICS OF FUEL CELLS OF URANIUM-GRAPHITE CHANNEL-TYPE POWER REACTOR CORE | 2013 |
|
RU2556889C2 |
Authors
Dates
2000-04-20—Published
1998-05-21—Filed