FIELD: nuclear engineering; retrofitting subchannels of high-power uranium-graphite tank reactor cores.
SUBSTANCE: proposed method for recovering serviceability of nuclear reactor fuel assembly subchannel includes reactor shutting down, dismounting of standard floor blocks from subchannel, and removal of fuel assembly. Process channel is checked for serviceability. Channel is visually inspected within reactor for integrity and channel inner diameter profile is measured. Then process channel pre-removal operations are made. Process channel is removed from subchannel and placed in storage. Construction clearance between process channel and graphite stacking is recovered by calibrating graphite column including finishing of central bore internal diameter to desired size and expansion device segment is installed between guard plate and top graphite block. Graphite column is checked for condition by inspecting inner surface of column. Telescopic joint height and inner diameter of graphite column central bore are measured. Then process channel removed earlier and found serviceable by its check results is reinstalled in fuel assembly subchannel. After that final mounting operations are conducted including welding of process channel to adjacent structures and formation of nuclear reactor subchannel.
EFFECT: ability of evaluating process channel life, reduced dose rate on attending personnel.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROLONGING LIFE OF CHANNEL-TYPE GRAPHITE NUCLEAR REACTOR | 2012 |
|
RU2501105C1 |
METHOD OF RESTORING LIFE CHARACTERISTICS OF FUEL CELLS OF URANIUM-GRAPHITE CHANNEL-TYPE POWER REACTOR CORE | 2013 |
|
RU2556889C2 |
METHOD OF EVALUATION OF REMAINING LIFE OF TELESCOPIC CONNECTIONS OF CHANNELS OF FUEL CELLS OF NUCLEAR CHANNEL REACTORS | 2008 |
|
RU2380773C1 |
EVALUATION METHOD OF RESIDUAL LIFE OF TELESCOPIC CONNECTIONS OF PATHS OF FUEL CELLS OF NUCLEAR CHANNEL-TYPE REACTOR | 2010 |
|
RU2422925C1 |
TRACK OF PROCESS CHANNEL OF NUCLEAR URANIUM-GRAPHITE REACTOR | 2011 |
|
RU2449390C1 |
PROCESS OF REPAIR OF GRAPHITE STACKING OF ACTIVE ZONE OF CHANNEL NUCLEAR REACTOR | 1993 |
|
RU2035071C1 |
FUEL CYCLE PROCESS OF PRESSURIZED-TUBE REACTOR | 2004 |
|
RU2266575C1 |
METHOD FOR DETERMINING OVERLAPPING VALUE OF TELESCOPIC JOINT OF UPPER PATH WITH FLANGE OF GRAPHITE COLUMN OF CHANNEL NUCLEAR REACTOR, AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2400839C1 |
METHOD FOR CHECKING PROCESS-CHANNEL-TO-GRAPHITE- STACKING CLEARANCE IN RBMK NUCLEAR REACTOR | 1998 |
|
RU2147775C1 |
METHOD FOR METERING OVERLAP OF TELESCOPIC JOINT IN UPPER LOOP WITH GRAPHITE COLUMN FLANGE OF PRESSURE-TUBE REACTOR | 2000 |
|
RU2184996C1 |
Authors
Dates
2007-07-10—Published
2005-12-09—Filed