FIELD: erection of cast-in-place lengthy concrete and reinforced- concrete constructions with the aid of horizontal slip forms, applicable, for instance, for erection of cast-in-place foundations of high-speed (300 to 350 km/h) railways. SUBSTANCE: the method consists in placement of concrete mix, moulding of line section with the aid of the board of the horizontal slip form, installation of expansion bolts, making-off of functional joints, hardening of concrete; moulding of the foundation complex section is performed by a vibrostamp simultaneously with installation of expansion bolts and making-off of functional joints, the vibrostamp acts on the line section with a periodicity of 2 to 5 min. EFFECT: reduced labour content and power intensity. 10 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR WINTER CONCRETING - "DRY HOT THERMOS" | 2000 | 
									
  | 
                RU2164867C1 | 
| HIGH-SPEED RAILWAY TRACK SUPERSTRUCTURE DESIGN AND METHOD OF ITS CONSTRUCTION | 2024 | 
									
  | 
                RU2828124C1 | 
| MONOLITHIC CONCRETE WALL | 0 | 
									
  | 
                SU1763602A1 | 
| DEVICE FOR SUBGRADE OF HIGH-SPEED IN AREAS WITH DEVELOPMENT OF KARST-SUFFUSION PROCESSES | 2018 | 
									
  | 
                RU2681179C1 | 
| SEPARATE GRADE CROSSING OF MOSCOW RING HIGHWAY AND YAROSLAVSKOYE SHOSSE | 1998 | 
									
  | 
                RU2139384C1 | 
| SLIDING FORMS | 0 | 
									
  | 
                SU1081319A1 | 
| RECONSTRUCTION METHOD FOR BEAM BRIDGE | 2003 | 
									
  | 
                RU2237124C1 | 
| FORM FOR FORMING AN EXPANSION JOINT IN CONCRETE STRUCTURES | 0 | 
									
  | 
                SU968265A1 | 
| METHOD OF MOUNTING SUPPORT MASONRY FORMWORK PROFILE | 2015 | 
									
  | 
                RU2598664C1 | 
| SLIP FORM FOR CONCRETING WATER DUCTS | 0 | 
									
  | 
                SU1008388A1 | 
Authors
Dates
2000-06-10—Published
1998-09-24—Filed