FIELD: oil and gas production. SUBSTANCE: productive well hole is divided into zones for separately recovering fluids from beds and separately passing them over into production string under critical flow conditions corresponding to values predetermined for flow rate and depression values in each bed. Pressure in production string is maintained at a level not exceeding the least of critical pressures of fittings passing over the fluids. EFFECT: increased fluid recovery reliability and efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING WELLS OPERATION | 1998 |
|
RU2151275C1 |
METHOD OF OIL WELLS OPERATION | 1998 |
|
RU2151276C1 |
BOREHOLE UNIT WITH FIELD EXPLOITATION MONITORING AND CONTROL SYSTEM | 2014 |
|
RU2569390C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
CONTROL METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2011 |
|
RU2482272C2 |
METHOD FOR DETERMINATION OF GAS FLOW RATE AND GAS FACTOR OF WELLS PRODUCT | 2010 |
|
RU2459953C1 |
METHOD FOR DEVELOPMENT OF HYDROCARBONS WITH ASSOCIATED OCCURRENCE AND HYDROMINERAL RAW MATERIAL OF MULTILAYER FIELD | 2013 |
|
RU2523318C1 |
METHOD OF OIL ANALYSIS FOR GAS-CONDENSATE RATIO | 2007 |
|
RU2348805C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL AND EQUIPMENT FOR ITS IMPLEMENTATION | 2011 |
|
RU2451164C1 |
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS | 2013 |
|
RU2547530C1 |
Authors
Dates
2000-06-20—Published
1998-04-03—Filed