FIELD: oil and gas production. SUBSTANCE: when developing deposit, the latter is exposed by producing and injection wells according to triangular grid to create areal 13-point reverse development elements with six wells in each concentric row. In late phase of development of nonuniform multipay deposit, strata with high and low permeability are marked. Heat carrier is injected to provide thermal-steam formation treatment in cyclic mode. Each cycle is performed in three steps. In the first step, heat carrier is injected simultaneously through central injector and through each second producer of outside ring into low-permeation strata. The rest of producers are used to take away product from all strata. In the second step, producing wells of outside ring, through which heat carrier was injected, are switched to take away product from low-permeability strata. On the contrary, producing wells of outside ring, through which product was taken away, are switched to inject heat carrier into all strata. Amount of heat carrier injected in this step is equal to amount of heat carrier introduced into development element in precedent step. In the third step, producers, through which heat carrier was injected into low-permeability strata, are switched to take away product from the same strata and product is taken away from all wells into which heat carrier was injected. EFFECT: increased oil recovery in late deposit development phase. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF HIGHLY VISCOUS OIL POOL UNDERLAID BY WATER | 2008 |
|
RU2365748C1 |
METHOD OF OIL POOL DEVELOPMENT WITH USE OF HORIZONTAL INJECTION WELLS | 2000 |
|
RU2166070C2 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSITS | 1995 |
|
RU2083810C1 |
METHOD OF DEVELOPING HIGH-VISCOSITY OIL DEPOSITS | 1997 |
|
RU2132942C1 |
PROCESS OF EXPLOITATION OF OIL FIELD | 2000 |
|
RU2159324C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT | 1996 |
|
RU2104394C1 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL DEPOSIT | 2012 |
|
RU2501941C2 |
DEVELOPMENT METHOD OF HIGH-VISCOSITY OIL AND BITUMEN DEPOSIT | 2010 |
|
RU2439307C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2007 |
|
RU2334094C1 |
PROCEDURE FOR DEVELOPMENT OF MULTI-PAY OIL DEPOSITS | 2014 |
|
RU2580671C1 |
Authors
Dates
2000-07-20—Published
1999-10-28—Filed