FIELD: development of gas-condensate deposits. SUBSTANCE: method includes hydrodynamic researches at different steady operating conditions of well; determination of production rate of gas, condensate and water by separation plant; calculation of production rate of mixture of gas, condensate and water under operating conditions in middle of tubing; construction of line of condensate production rate; construction of stable condensate production rate versus gas, condensate and water mixture production rate graph. Value of optimal production rate of well is determined by point of break of curve of given relationship lying on line of potential production rate. EFFECT: prolonged term of pool development at energy-saving regime to obtain additional condensate from pool. 3 cl, 2 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD DETERMINING PRESSURE OF START OF CONDENSATION OF STRATAL GAS | 1999 |
|
RU2164292C2 |
METHOD FOR DEVELOPMENT OF GAS-CONDENSATE DEPOSIT | 1997 |
|
RU2137917C1 |
METHOD OF INCREASE OF CONDENSATE OUTPUT BY EXPLOITED OIL AND GAS CONDENSATE DEPOSIT OBJECT | 2019 |
|
RU2713553C1 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD FOR DEVELOPMENT OF LOW-PERMEABILITY OIL DEPOSIT | 2023 |
|
RU2813421C1 |
METHOD FOR SEPARATE DERERMINATION OF THE AMOUNT OF DISSOLVED GAS AND CAP GAS IN ASSOCIATED PETROLEUM GAS | 2020 |
|
RU2744043C1 |
METHOD FOR DETERMINING DYNAMIC BOTTOMHOLE PRESSURE OF DEEP GAS CONDENSATE WELL | 2022 |
|
RU2799898C1 |
METHOD OF OPERATION OF GAS-CONDENSATE DEPOSIT | 2008 |
|
RU2366803C1 |
METHOD FOR DEVELOPMENT OF OIL RIM OF OIL AND GAS CONDENSATE RESERVOIR | 2010 |
|
RU2433253C1 |
METHOD FOR DEVELOPMENT OF MULTI-LAYER DEPOSITS OF NATURAL GASES | 2019 |
|
RU2722190C1 |
Authors
Dates
2000-08-10—Published
1998-11-23—Filed