FIELD: running of gas condensate fields. SUBSTANCE: method can be used for establishment of operational conditions. In agreement with method flow rates of stratal gas, condensate and water are measured. Samples are taken while conducting hydrodynamic investigations and component composition of stratal gas is found. In this case pressure and temperature are measured in shaft of hoist within specified measurement intervals as well as pressure and temperature across well-head and well face. Mean values of pressures and temperatures in each measurement are determined by measured values of pressures and temperatures. Densities of gas condensate mixture and stratal gas in each measurement interval are found by measured composition of stratal gas, flow rates of gas, condensate and water and mean values of pressures and temperatures in each measurement interval. Graph of change of densities of stratal gas and gas condensate mixture depending on mean values of pressure in each measurement interval is constructed and pressure of start of condensation of stratal gas is determined by intersection point of curves in graph. EFFECT: increased accuracy in determination of pressure of start of condensation of stratal gas in process of operation of gas wells. 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING OPTIMAL PRODUCTION RATE OF PRODUCING GAS-CONDENSATE WELL | 1998 |
|
RU2154155C1 |
METHOD FOR OBTAINING REPORTING DATA ON GAS-CONDENSATE CHARACTERISTICS OF PLASTIC GAS FOR STABLES UNDER ABNORMALLY HIGH PLATE PRESSURE | 2018 |
|
RU2678271C1 |
METHOD FOR DETERMINING DYNAMIC BOTTOMHOLE PRESSURE OF DEEP GAS CONDENSATE WELL | 2022 |
|
RU2799898C1 |
METHOD OF OPERATION OF GAS-CONDENSATE DEPOSIT | 2008 |
|
RU2366803C1 |
METHOD FOR OPERATION OF GAS-CONDENSATE WELL | 1997 |
|
RU2120541C1 |
METHOD FOR DETERMINING PHASE PERMEABILITIES | 2023 |
|
RU2805389C1 |
METHOD OF SURVEY OF WELLS | 1999 |
|
RU2165519C1 |
METHOD FOR DETERMINING SPECIFIC AND TOTAL QUANTITY OF LIQUID WATER PHASE SUPPLIED FROM WELL TO FIELD GAS-COLLECTING HEADER | 2010 |
|
RU2460879C2 |
METHOD FOR OPERATION OF GAS-CONDENSATE DEPOSIT | 2002 |
|
RU2245997C2 |
METHOD OF DEVELOPING GAS-CONDENSATE FIELD WITH UNDERLYING OIL FRINGE | 0 |
|
SU1629504A1 |
Authors
Dates
2001-03-20—Published
1999-02-23—Filed