FIELD: development of oil-gas pools applicable in oil production by oil displacement with gas of gas cap or with water of edge water zone. SUBSTANCE: flow string is successively perforated interval by interval, from packer to pool roof. Determined for each interval is injectivity of well to assign rate of water and high-density weighted drilling mud injection. Then successively injected into interval of perforation are portions of weighted drilling mud and water to form impermeable partition round bores of producing wells. In so doing, it is not allowed to exceed initial formation pressure by more than 10% in forcing the last portion of weighted drilling mud by water from well to formation. EFFECT: higher oil recovery factor and reduced expenditures for oil production. 3 cl, 3 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED FROM IT WITH NON-PERMEABLE INTERLAYER | 2011 |
|
RU2478164C1 |
METHOD OF EXPLOITATION OF GAS-OIL POOLS | 1992 |
|
RU2027848C1 |
METHOD OF DEVELOPING OIL AND GAS DEPOSITS | 2015 |
|
RU2610485C1 |
GAS-OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2543009C1 |
METHOD OF DEVELOPMENT OF OIL POOL LOCATED ABOVE GAS POOL AND SEPARATED THEREFROM BY IMPERMEABLE PARTING | 2012 |
|
RU2499134C2 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED WITH NON-PERMEABLE INTERLAYER FROM IT | 2011 |
|
RU2502861C2 |
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS | 2013 |
|
RU2547530C1 |
METHOD FOR DEVELOPMENT OF OIL GAS FIELDS | 1991 |
|
RU2049913C1 |
METHOD OF DEVELOPMENT OF BITUMINOUS OIL RESERVOIR FROM HORIZONTAL WELL | 2016 |
|
RU2626500C1 |
DEVELOPMENT METHOD FOR GAS-AND-OIL FIELD CHARACTERIZED BY HIGHLY-VISCOUS OIL | 2005 |
|
RU2295634C2 |
Authors
Dates
2000-08-10—Published
1998-06-22—Filed