FIELD: oil and gas industry.
SUBSTANCE: method involves drilling of vertical and horizontal production and injection wells in oil deposit, pumping of working fluid to injection wells and extraction of products from production wells. Drilling of an additional horizontal well in gas deposit is performed; then, branches directed upwards through a non-permeable interlayer with outlet of branches to oil deposit are drilled out of it. Water is pumped from the head to the additional horizontal well so that gas-water mixture is formed in the same well. At gas leakage to shafts of production wells, product extraction from the same wells is reduced by 40-50% till bottomhole pressure in them is recovered. After that, product extraction from the same wells in previous volume is continued.
EFFECT: increasing oil extraction coefficient.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL POOL LOCATED ABOVE GAS POOL AND SEPARATED THEREFROM BY IMPERMEABLE PARTING | 2012 |
|
RU2499134C2 |
DEVELOPMENT METHOD OF OIL DEPOSIT LOCATED ABOVE GAS DEPOSIT AND SEPARATED FROM IT WITH NON-PERMEABLE INTERLAYER | 2011 |
|
RU2478164C1 |
METHOD TO DEVELOP OIL DEPOSIT WITH GAS CAP (VARIANTS) | 2006 |
|
RU2312983C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2469183C2 |
METHOD OF OIL-GAS POOL DEVELOPMENT | 1998 |
|
RU2154156C2 |
METHOD OF OIL DEPOSIT DEVELOPMENT BY THERMAL AND WATER-GAS SIMULATION | 2013 |
|
RU2534306C1 |
DEVELOPMENT METHOD OF FRACTURED HIGH-VISCOSITY OIL DEPOSIT | 2011 |
|
RU2483207C2 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS | 1997 |
|
RU2112868C1 |
DEVELOPMENT OF OIL DEPOSIT BY HEAT AND WATER-GAS IMPACTS IN VERTICAL, HORIZONTAL AND MULTIHOLE WELLS SYSTEM | 2013 |
|
RU2524580C1 |
GAS-OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2543009C1 |
Authors
Dates
2013-12-27—Published
2011-10-19—Filed