FIELD: oil and gas producing industry, particularly, production of hydrocarbons with use of chemical substances; applicable in treatment of bottom-hole formation zones. SUBSTANCE: compound includes aqueous solution of carbamide monoperoxydrate, strong mineral acid and nonionic surfactant with the following amounts of ingredients, wt.%: carbamide monoperoxohydrate ((NH2CONH2•H2O2)) 7-20; strong acid (HCl) and nonionic surfactant 0.5-1.5; the balance, water. Compound is prepared at wellhead and supplied to interval of perforations through tubing. Solution is forced into bottom-hole zone by means of excessive pressure and held there for 12 h. As a result of reaction of ions of solution with ions of polymer- argillaceous colmatage formations, their bodies are destroyed with subsequent dispersion to finely dispersed fraction. Subsequent pumping of well by any known method allows easy removal of colmatants from bottom-hole zone. Reagents used for preparation of offered compound are distinguished by their chemical stability and availability. EFFECT: higher efficiency of treatment of bottom-hole formation zone of high- temperature formations due to reduction of time of dispersion and higher dispersity of colmatage formations of polymer-argillaceous composition with simultaneous extension of assortment of chemical substances used in treatment of well bottom-hole zones. 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROCESSING PRIMARILY FLAT HORIZONTAL WELL HOLE FOR REMOVAL OF MUD BULK FROM BOTTOM-HOLE FORMATION ZONE | 2011 |
|
RU2467163C1 |
METHOD FOR COLMATAGE REMOVAL FROM BOTTOMHOLE FORMATION ZONE UPON FIRST OPENING TO RESTORE PERMEABILITY AND POROSITY OF HEADER | 2013 |
|
RU2540767C1 |
COMPOSITION FOR THE CHEMICAL TREATMENT OF THE WELLBORE ZONE OF THE RESERVOIR | 2018 |
|
RU2681132C1 |
METHOD OF TREATMENT OF BOTTOM-HOLE ZONE WITH CHEMICAL REAGENT | 2000 |
|
RU2181832C2 |
METHOD FOR TREATING PRODUCTIVE BED | 1996 |
|
RU2102591C1 |
REAGENT FOR DESTRUCTION OF SEDIMENTATING CLAYEY FORMATIONS IN BOTTOM-HOLE ZONE OF BED AFTER DRILLING OR OVERHAUL OF WELL | 1997 |
|
RU2124122C1 |
METHOD FOR MUDDING FORMATION REMOVING FROM BOTTOMHOLE ZONE OF TERRIGENOUS FORMATION | 2004 |
|
RU2283952C2 |
METHOD FOR TREATMENT OF PRODUCTIVE BED | 2002 |
|
RU2230184C2 |
TREATMENT METHOD FOR BOTTOMHOLE AREA OF TERRIGENOUS BED OF GAS WELL UNDER ABNORMAL LOW PRESSURE | 2003 |
|
RU2261323C1 |
METHOD FOR MUDDING FORMATION REMOVING FROM BOTTOMHOLE TERRIGENOUS FORMATION AREA | 2004 |
|
RU2272127C1 |
Authors
Dates
2000-09-10—Published
1999-11-30—Filed