FIELD: mining industry. SUBSTANCE: according to method, ascending entry is driven through center of kimberlite pipe. Rock matter is extracted layer by layer along spiral line by means of mechanized complex which is radially installed from central ascending entry to contour of kimberlite pipe. Filling of worked-out space is performed after advancing of mechanized complex. Driving of laminated ventilation drift is carried out by heading machine along spiral line in ascending pattern. To reduce loss of ore in zone close to contour at irregular configuration of kimberlite pipe in plan, performed simultaneously with driving laminated ventilation drift by heading machine is development of peripheral parts located beyond boundaries of circumference where mechanized complex is operating. Supporting of laminated ventilation drift and stoping runs is undertaken by means of hydraulically operated supports which are installed by self-propelled crane. Worked-out space is filled with material delivered by transportation facilities of mechanized complex. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING KIMBERLITE DEPOSIT EXTENDED ALONG STRIKE BY INCLINED SLICING UNDER FLEXIBLE GUARD ROOFING BY POWERED MINING SET | 1998 |
|
RU2151295C1 |
PROCESS OF LAYER-BY-LAYER DEVELOPMENT OF KIMBERLITE PIPE IN ASCENDING ORDER WITH BACKFILL AND POWERED COMPLEX FOR METHOD EMBODIMENT | 2001 |
|
RU2203420C2 |
METHOD AND POWERED COMPLEX FOR MINING KIMBERLITE PIPES | 1996 |
|
RU2116447C1 |
METHOD OF DOWNWARD WORKING OF KIMBERLITE PIPE BY POWERED MINING COMPLEX AND DESIGN OF FLEXIBLE GUARD ROOFING | 1998 |
|
RU2155867C2 |
METHOD OF RISE RILL CUT MINING WITH FILLING OF PIPE-LIKE KIMBERLITE DEPOSITS BY POWDER MINING COMPLEX | 1998 |
|
RU2155868C2 |
METHOD OF MINING OF TUBULAR KIMBERLITE DEPOSITS BY POWERED MINING COMPLEX | 1998 |
|
RU2153073C2 |
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
METHOD FOR EXTRACTION OF KIMBERLITE PIPE UNDER ELASTIC SHIELDS | 2003 |
|
RU2242611C1 |
METHOD FOR DEVELOPING KIMBERLITE PIPE IN ASCENDING PROCEDURE WITH DRY GOBBING | 1997 |
|
RU2132461C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
Authors
Dates
1999-08-27—Published
1997-06-03—Filed