FIELD: mining; applicable in underground mining of thick steep coal seams. SUBSTANCE: method includes coal mining by blocks; driving of vent, belt and sublevel drifts, raise on block flanks; drilling of deep holes in blocks; series hole blasting at a time with millisecond delay and discharge of broken coal through bunkers onto belt drift. Raises are also driven in middle part of blocks. Cross-cuts are driven from raises across the strike through full heights of blocks. Drilled from cross-cuts are deep horizontal and slightly inclined holes and also upward holes. Blasting of the first series of holes forms the clamping medium through entire thickness of seam: blasting of hole charges at level of sublevel and vent drifts in lower and upper parts of block; blasting of upward holes between cross-cuts in middle part of blocks, and breakage of coal block by series of secondary blasting of horizontal and slightly inclined holes in compressed medium. It is expediently to break block of strong coal by secondary series of blasting of upward holes in compressed medium. Claimed method provides for higher safety of mining due to absence of nonsupported space in drilling and charging of holes and blasting of hole charges at one step in compressed medium with absence of free space for accumulation and explosion of methane and coal dust. EFFECT: higher safety of mining operations, reduced labor input in preparation for mining and mining of coal mass. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF THICK STEEP-DIPPING COAL SEAMS | 1998 |
|
RU2138639C1 |
METHOD OF MINING THICK STEEP COAL SEAMS | 1994 |
|
RU2078211C1 |
METHOD FOR MINING STEEP SEAMS | 1997 |
|
RU2123597C1 |
METHOD OF MINING OF THICK STEEPLY DIPPING SEAMS BY STRINGS ON THE STRIKE | 1995 |
|
RU2101500C1 |
METHOD FOR DEVELOPMENT OF STEEP COAL SEAMS WITH BACKING WORKED-OUT AREA | 1995 |
|
RU2083833C1 |
METHOD FOR MINING THICK STEEPLY INCLINED AND STEEP COAL BEDS | 2009 |
|
RU2398966C1 |
METHOD FOR WORKING OF STEEPLY DIPPING ORE BODIES | 0 |
|
SU1775558A1 |
METHOD FOR LONGWALL ADVANCING TO THE RISE WITH SUBLEVEL COAL CUTTING AND HYDRAULIC STOWING OF GOBS | 0 |
|
SU1797656A3 |
DEVELOPMENT METHOD OF THICK STEEP COAL BEDS | 2011 |
|
RU2477795C1 |
METHOD FOR PREPARATION AND EXCAVATION OF INCLINED AND STEEP MINERAL BED | 2004 |
|
RU2270338C1 |
Authors
Dates
2000-10-20—Published
1999-01-25—Filed