FIELD: construction engineering. SUBSTANCE: method involves installation of reinforcing members under foundation. Novelty is that stiff guides joined together through openings in foundation body are placed on each side of foundation before introducing reinforcing members. The latter are, essentially, slabs with comb-like underside. Then reinforcing members are introduced over guides until teeth enter their comb-like parts under foundation. Upon removing the guides, reinforcing members are joined by means of tension bars through openings in foundation. EFFECT: improved bearing capacity of foundation - footing due to introduction of reinforcing members. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR FOUNDATION REINFORCEMENT | 1999 |
|
RU2153557C1 |
METHOD AND DEVICE FOR INCREASING LOAD-BEARING CAPACITY OF FOUNDATION | 1997 |
|
RU2134325C1 |
RESERVOIR FOUNDATION | 2001 |
|
RU2209883C1 |
FOUNDATION | 1999 |
|
RU2170795C2 |
TECHNIQUE FOR REINFORCEMENT OF RECONSTRUCTED BUILDINGS | 2000 |
|
RU2197585C2 |
FOUNDATION FOR CYLINDRICAL TANK | 2001 |
|
RU2203361C2 |
FOUNDATION OF ISOTHERMAL TANK | 2001 |
|
RU2204655C1 |
BOX-LIKE FOUNDATION FOR NON-UNIFORMLY SINKING SOIL | 2002 |
|
RU2228403C2 |
FOUNDATION WIDENING METHOD | 2004 |
|
RU2276709C1 |
METHOD FOR HIGHLY-RIGID PANEL FOUNDATION ERECTION IN CLAY GROUND | 2004 |
|
RU2276708C1 |
Authors
Dates
2000-11-27—Published
1998-12-15—Filed