FIELD: building, particularly panel foundations for multistory buildings and structures, which apply non-uniform loads to ground base.
SUBSTANCE: method involves forming crossing slots in ground; reinforcing the slots with frames and concreting the slots. For panel foundation erection in clay ground pit is preliminarily dug in ground. Then crossing slots adapted for reinforcing frames receiving are created in pit ground, wherein the reinforcing frames have projected parts. Areas of reinforcing frames intersection are additionally reinforced along with connecting projected parts and concreting thereof to fill the slots.
EFFECT: increased operational effectiveness and reduced costs.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HIGHLY-RIGID PLATE FOUNDATION ERECTION | 2006 |
|
RU2303106C1 |
TECHNIQUE FOR ERECTING SOLID CORE FOUNDATION SLAB | 2006 |
|
RU2325483C1 |
METHOD FOR ERECTION OF SLAB-PILE FOUNDATION | 2009 |
|
RU2390609C1 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
METHOD FOR ERECTION OF FOUNDATION SLAB OF FRAMED STRUCTURE | 2008 |
|
RU2379424C1 |
PILE-PLATE FOUNDATION | 2016 |
|
RU2649352C1 |
STRUCTURAL UNIT FOR COMPOSITE DIAPHRAGM WALL CONSTRUCTION AND COMPOSITE DIAPHRAGM WALL | 2006 |
|
RU2292422C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS | 2015 |
|
RU2604098C1 |
UNDERGROUND STRUCTURE CONSTRUCTED IN FOUNDATION PIT AND METHOD OF CONCRETING | 1997 |
|
RU2131496C1 |
METHOD FOR CONSTRUCTION OF MONOLITHIC REINFORCED CONCRETE FOUNDATION WITH EXACT LOCATION OF ANCHOR REINFORCEMENT BARS OF PERIODIC PROFILE WITH ANY SURFACE RELIEF | 2014 |
|
RU2583381C2 |
Authors
Dates
2006-05-20—Published
2004-11-01—Filed