FIELD: construction engineering, long-span buildings and structures. SUBSTANCE: main accessories are placed in pneumatic form with their convex part down to form yielding spatial suspension structure, and then grouted in concrete. In the course of dome shaping accessories are loaded with set of weights distributed to obey specified mechanism over external and internal surfaces with the result that accessories undergo desired deformation dictating its pre-stress level and formation of design shape of dome. EFFECT: enlarged range of dome shapes of ceilings. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PRE-FABRICATED HANGAR BASED ON PNEUMATIC FORMWORK | 2020 |
|
RU2747998C1 |
METHOD FOR CONSTRUCTION OF LANCED DOME DESIGN | 2017 |
|
RU2694455C2 |
FORMWORK FOR REINFORCED CONCRETE STRUCTURES AND BUILDINGS | 2020 |
|
RU2737744C1 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
METHOD OF CONSTRUCTING POLYGONAL THIN-WALL FERROCONCRETE DOME-LIKE STRUCTURE | 0 |
|
SU1288279A1 |
METHOD OF CONSTRUCTING THIN-WALL VAULTS AND VAULTED STRUCTURES | 0 |
|
SU1461845A1 |
REINFORCEMENT | 1996 |
|
RU2116411C1 |
REINFORCEMENT | 1997 |
|
RU2133321C1 |
METHOD OF ERECTION OF FERROCONCRETE SPHERICAL VAULTS | 2001 |
|
RU2213835C2 |
LIQUEFIED NATURAL GAS STORAGE TANK | 2024 |
|
RU2824699C1 |
Authors
Dates
2000-12-10—Published
1999-03-16—Filed