FIELD: building production process. SUBSTANCE: the device has a ramming member, bedplate, drive mechanism in the form of a detonation chamber formed by the cavity between the additional load and resonance plate, the resonance plate is connected to the additional load and ramming member for movement. The additional load mass exceed the resonance plate mass. EFFECT: enhanced dynamic pressures at molding. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SHOCK-WAVE GAS-DYNAMIC INSTALLATION FOR MOULDING OF CONCRETE OBJECTS WITH EMPTINESSES | 1999 |
|
RU2169073C2 |
SHOCK-WAVE METHOD FOR TREATMENT OF CONGLOMERATE MEDIA AT FORMATION OF ARTIFICIAL BUILDING MATERIALS | 1999 |
|
RU2164204C2 |
WEDGE SHOCK-WAVE GAS DYNAMIC INSTALLATION FOR CONCRETE MOULDING | 1999 |
|
RU2163543C2 |
PULSED DETONATION ROCKET ENGINE | 2017 |
|
RU2649494C1 |
DETONATION HAMMER | 2006 |
|
RU2325481C2 |
INTERMITTENT DETONATION ENGINE | 2012 |
|
RU2490498C1 |
INTERMITTENT DETONATION ENGINE | 2010 |
|
RU2435059C1 |
OPERATING METHOD OF PULSE-DETONATION ENGINE IN CENTRIFUGAL FORCE FIELD AND DEVICE FOR IMPLEMENTATION THEREOF IN JET HELICOPTER | 2018 |
|
RU2718726C1 |
PULSE DETONATION INITIATION METHOD | 2017 |
|
RU2659415C1 |
PULSATING DETONATION JET ENGINE | 2020 |
|
RU2752817C1 |
Authors
Dates
2000-12-20—Published
1999-08-16—Filed