Abstract RU 2165658 C1

FIELD: high-temperature geothermal systems for heat and power generation and industrial waste processing. SUBSTANCE: complex using steam-water mixtures taken from geothermal wells has geothermal service well, heat-transfer apparatus, secondary coolant circuit, turbine-generator set, steam condenser, pump, and waste processing system. Novelty is that delivery and inspection wells are introduced, metering pump is used, service well outlet communicates with turbine-driven separator which is connected to generator; one of separator outputs is connected to input of heat- transfer apparatus whose secondary coolant is service water; heat-transfer apparatus has consumed-water outlet and thermal-water outlet; the latter communicates through first metering pump with delivery-well inlet; second output of separator is connected to gauze separator whose output is coupled with turbine-generator set; steam condenser is mounted in tandem with turbine-generator set; its output is connected to input of first metering pump. Waste processing system has liquid radioactive waste container connected through second metering pump to delivery-well inlet; inspection well accommodates delivery-well inspection instruments and control devices of metering pumps; distance between delivery and inspection wells meets condition Rd-s/Rr≥ 2,, where Rd-s is distance between delivery and service wells; Rr is radius of service-well effective range. EFFECT: enhanced available heat factor of geothermal well; enlarged range of wastes processed. 1 dwg

Similar patents RU2165658C1

Title Year Author Number
METHOD FOR DISPOSAL OF LIQUID RADIOACTIVE WASTES 2000
  • Sivoronov N.V.
RU2165657C1
UNDERGROUND NUCLEAR POWER COMPLEX 2012
  • Khafizov Tagir Mavlitovich
  • Khafizov Gleb Tagirovich
  • Denisov Sergej Egorovich
RU2510088C1
METHOD AND DEVICE FOR DISPOSAL OF RADIOACTIVE WASTES 2002
  • Renne V.G.
RU2227337C2
STEAM-POWER UNIT FOR GEOTHERMAL POWER PLANT 1991
  • Alkhasov A.B.
  • Gajdarov G.M.
  • Magomedbekov Kh.G.
RU2035588C1
PROCESSING COMPLEX FOR EXTRACTION OF HARD-TO-RECOVER HYDROCARBONS (EMBODIMENTS) 2020
  • Gujber Otto
RU2741642C1
STEAM-TURBINE PLANT FOR GEOTHERMAL POWER STATION 1996
  • Alkhasov A.B.
RU2110019C1
GEOTHERMAL PLANT 2012
  • Bolotov Robert Aleksandrovich
RU2511993C2
METHOD OF COMPLEX USE OF GEOTHERMAL HEAT BY MEANS OF STEAM EJECTOR HEAT PUMP 2011
  • Stojanov Nikolaj Ivanovich
  • Voronin Aleksandr Il'Ich
  • Gejvandov Iogann Arestagesovich
  • Smirnov Stanislav Sergeevich
RU2528213C2
STEAM-TURBINE PLANT FOR GEOTHERMAL POWER STATION 2003
  • Alkhasov A.B.
RU2246010C1
GEOTHERMAL POWER PLANT 2007
  • Akhmedov Ganapi Jangievich
RU2343368C1

RU 2 165 658 C1

Authors

Sivoronov N.V.

Dates

2001-04-20Published

2000-08-17Filed