FIELD: underground construction, particularly, devices for erection of underground structures from cast-in-situ pressed concrete; applicable in erection of tunnels and mine shafts. SUBSTANCE: device has a shield with hydraulic jacks, pressure ring, pressure forms whose external surface in zone of motion of pressure ring is parallel to device longitudinal axis. Hydraulic cylinders for moving of pressure forms in longitudinal direction are secured with their one ends to shield and with the other ends to pressure forms. External surface of pressure forms is narrowing at acute angle to the device longitudinal axis beyond the zone of movement of pressure ring, and then again parallel to device longitudinal axis. EFFECT: higher quality of erected structures from cast-in-situ pressed concrete. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE AND DEVICE FOR METHOD EMBODIMENT | 2000 |
|
RU2166089C1 |
DEVICE FOR ERECTION OF UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE | 1999 |
|
RU2166091C1 |
FACILITY FOR ERECTION OF UNDERGROUND STRUCTURE FROM POURED- IN-PLACE PRESSED CONCRETE | 2001 |
|
RU2184238C1 |
DEVICE FOR ERECTION OF LINING IN SUBSURFACE STRUCTURE FROM MONOLITHIC-PRESSED CONCRETE | 1998 |
|
RU2144617C1 |
DEVICE FOR LINING OF UNDERGROUND STRUCTURE CAST IN SITU | 1999 |
|
RU2154736C1 |
METHOD OF CONSTRUCTION OF MINE SHAFT FROM MONOLITHIC PRESSED CONCRETE | 2000 |
|
RU2171378C1 |
DEVICE FOR LINING UNDERGROUND STRUCTURE WITH CAST-IN-SITU STRUCTURE | 1998 |
|
RU2151298C1 |
METHOD OF VERTICAL AND INCLINED WORKINGS DRIVING AND SUPPORTING AND GUARD SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2607824C1 |
TUNNEL SHIELD | 2001 |
|
RU2184237C1 |
METHOD FOR CONSTRUCTING A TUNNEL OF NON-CIRCULAR CROSS-SECTION AND SHIELD FOR DRIVING A TUNNEL OF NON-CIRCULAR CROSS-SECTION | 2003 |
|