FIELD: underground construction; applicable in construction of tunnels and mine shafts. SUBSTANCE: device has a tunneling shield with shield jacks, forms with hydraulic cylinders of their moving, pressure ring and branch pipe for supply of concrete mix to space between shield body and forms. Device also has a supporting collar embracing inlet part of window of underground structure over which perimeter ends of reinforcing wire ropes are attached. Secured to shield body on the side of location of shield hydraulic jacks are drums on which the other secured end of reinforcing wire ropes is wound. Reinforcing wire ropes are located between external surface of forms and internal surface of shield body. Drum has a brake secured to the shield body. EFFECT: higher quality of erected structure and simplified initial engagement of shield. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE AND DEVICE FOR METHOD EMBODIMENT | 2000 |
|
RU2166089C1 |
FACILITY FOR ERECTION OF UNDERGROUND STRUCTURE FROM POURED- IN-PLACE PRESSED CONCRETE | 2001 |
|
RU2184238C1 |
DEVICE FOR ERECTION OF LINING IN SUBSURFACE STRUCTURE FROM MONOLITHIC-PRESSED CONCRETE | 1998 |
|
RU2144617C1 |
DEVICE FOR ERECTION OF UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE | 1999 |
|
RU2166090C1 |
DEVICE FOR LINING OF UNDERGROUND STRUCTURE CAST IN SITU | 1999 |
|
RU2154736C1 |
TUNNEL SHIELD | 2001 |
|
RU2184237C1 |
DEVICE FOR LINING UNDERGROUND STRUCTURE WITH CAST-IN-SITU STRUCTURE | 1998 |
|
RU2151298C1 |
METHOD OF CONSTRUCTION OF MINE SHAFT FROM MONOLITHIC PRESSED CONCRETE | 2000 |
|
RU2171378C1 |
METHOD FOR CONSTRUCTING A TUNNEL OF NON-CIRCULAR CROSS-SECTION AND SHIELD FOR DRIVING A TUNNEL OF NON-CIRCULAR CROSS-SECTION | 2003 |
|
RU2235883C1 |
METHOD OF VERTICAL AND INCLINED WORKINGS DRIVING AND SUPPORTING AND GUARD SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2607824C1 |
Authors
Dates
2001-04-27—Published
1999-12-30—Filed