FIELD: underground construction, construction of various tunnels. SUBSTANCE: facility includes tunnel shield with mechanism for processing of ground, shield hydraulic jacks, moulding forms with hydraulic jacks for their displacement, moulding ring and branch pipe to feed concrete mixture. Facility is fitted with expanding mechanism located on side of tail part of moulding forms and movably joined to forms. It is manufactured in the form of semi-rings interlinked by means of hydraulic jacks. One semi-ring is equipped with columns, free end of each column has carrying roller mounted for interaction with internal surface of poured-in-place pressed lines of underground structure. EFFECT: increased efficiency and productivity of operation of facility in soft, quick grounds. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ERECTION OF UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE | 1999 |
|
RU2166091C1 |
DEVICE FOR ERECTION OF LINING IN SUBSURFACE STRUCTURE FROM MONOLITHIC-PRESSED CONCRETE | 1998 |
|
RU2144617C1 |
METHOD OF ERECTING UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE AND DEVICE FOR METHOD EMBODIMENT | 2000 |
|
RU2166089C1 |
DEVICE FOR ERECTION OF UNDERGROUND STRUCTURE FROM CAST-IN-SITU PRESSED CONCRETE | 1999 |
|
RU2166090C1 |
DEVICE FOR LINING OF UNDERGROUND STRUCTURE CAST IN SITU | 1999 |
|
RU2154736C1 |
METHOD OF CONSTRUCTION OF MINE SHAFT FROM MONOLITHIC PRESSED CONCRETE | 2000 |
|
RU2171378C1 |
TUNNEL SHIELD | 2001 |
|
RU2184237C1 |
DEVICE FOR LINING UNDERGROUND STRUCTURE WITH CAST-IN-SITU STRUCTURE | 1998 |
|
RU2151298C1 |
METHOD FOR CONSTRUCTING A TUNNEL OF NON-CIRCULAR CROSS-SECTION AND SHIELD FOR DRIVING A TUNNEL OF NON-CIRCULAR CROSS-SECTION | 2003 |
|
RU2235883C1 |
METHOD OF VERTICAL AND INCLINED WORKINGS DRIVING AND SUPPORTING AND GUARD SYSTEM FOR ITS IMPLEMENTATION | 2015 |
|
RU2607824C1 |
Authors
Dates
2002-06-27—Published
2001-04-23—Filed