FIELD: oil industry.
SUBSTANCE: according to first variant of method, force and product wells are drilled, working agent is fed through force wells, oil is extracted through product wells, dome-like raised portions are marked out, which surpass absolute marks of bed, additional wells are positioned in these portions. Wells placement is planned at tops of dome-like raised portions even with breach of evenness of planned well mesh. After full drilling of wells mesh and in case of more accurate definition according to data of drilled wells of deposit of dome-like portions side shafts are drilled from adjacent wells towards more precisely defined tops of dome-like portions, controlling the deposit. In adjacent wells and side shafts, positioned on tops of dome-like raised portions , range of productive bed is opened between absolute mark of ceiling in this well and absolute mark, appropriate for ceiling in closest well. According to second variant of method practically analogical operations are realized as in first variant, except when absolute mark of ceiling of productive bed according to adjacent wells is lower than mark of sole of productive bed, whole bed is opened in side shafts.
EFFECT: higher efficiency.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330944C2 |
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330948C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2506419C1 |
METHOD FOR DEVELOPING OIL DEPOSIT | 2006 |
|
RU2327860C1 |
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330943C2 |
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330945C2 |
METHOD OF OIL POOL DEVELOPMENT | 2009 |
|
RU2395674C1 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL DEPOSIT AT LATE STAGE OF DEVELOPMENT | 2011 |
|
RU2454533C1 |
BOREHOLE RUNNING IN METHOD | 1992 |
|
RU2039217C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT COMPLICATED WITH VERTICAL RUPTURE | 2010 |
|
RU2431740C1 |
Authors
Dates
2005-06-20—Published
2003-10-22—Filed